Bijeshwari Marga, Swayambhu-15, Kathmandu, Nepal +00977-1-4273036, 4282054
Follow us:
Waiba Infratech
  • HOME
  • About Us
    • Company Profile
    • Basic Information
    • Basic ISO
    • Our Team
    • Our Awards
  • SERVICES
  • PROJECTS
  • BLOGS
  • Careers
  • CONTACT

Construction of Head Race Tunnel & Surge Shaft for Marsyangdi Hydro Electric Project

  • Client Marsyangdi Hydro Electric Project
  • Location Marsyangdi
  • Year completed 2018
  • Category Hydro Electric Project
Image
Image
Image
Image
PROJECT DESCRIPTION

The 400kV Dhalkebar substation project was part of the 400kV Hetauda-Dhalkebar-Inaruwa substation expansion project, funded by the Government of Nepal. The 400kV Dhalkebar substation is connected to the Muzaffarpur (Bihar, India) substation via the 400kV Dhalkebar- Muzaffarpur cross border transmission line that will also be connected to Hetauda and Inaruwa via the 400kV Hetauda-Dhalkebar-Inaruwa transmission line.
The Dhalkebar-Muzzaffarpur cross-border link became instrumental for exporting/importing the electricity between Nepal and India. Dhalkebar substation aims to serve as a backbone to transmission line system in the national grid of Nepal.

RELATED PROJECTS

Image
Substation at kathmandu
Image
Construction of Head Race Tunnel & Surge Shaft for Marsyangdi Hydro Electric Project
Image
Construction of Test Adit Tunnel for Dudhkoshi Storage Hydro Electric Project
Image
Transmission line from Dharan to Dhankuta
Image
Electrical Distribution Network at the area of Gorkha
Image
6/8 MVA substation at Taplejung
Image
Construction of 400 KV GIS Substation at Dhalkebar

Image

Waiba Infratech Pvt. Ltd

Waiba Infratech, has the reputation of providing quality work to our customers

Who We Are

  • Company Profile
  • Information
  • Iso
  • AWARDS

Quick Links

  • Projects
  • Photo Gallery
  • Contact

Contact Us

  • Bijeshwari Marga, Swayambhu-15, Kathmandu, Nepal
  • CALL US : +00977-1-4273036, 4282054
  • waiba_cmc@yahoo.com , waibainfratech@gmail.com , info@waibainfratech.com
© Waiba Infratech
Powered by Origami Technology